|
|
|
| Major League FieldNone scheduled thus far.
Valparaiso FieldOct 30, 2004, 9am - 2pm We had a very productive day preparing the Valparaiso Field for the winter by leveling, top-dressing, and over-seeding. A big thank you to all who helped:
Nov 22, 2004, 6pm - 8pm Equipment was sorted, cleaned, inventoried to determine what needed to be replaced for the 2005 season by the following workers:
Nov 26, 2004, 8am - 1pm A follow-up workday was required to touch up leveled and over-seeded areas. This work was performed by:
Twin OaksNone scheduled thus far.
|